Thursday, December 31, 2009

Mixing of Liquid EPDM

Mixing of Liquid EPDM Rubber with catalyst. Working time for each container is 4-6 hours once catalyst is mixed.



Saturday, December 19, 2009

Application and Uses Of Liquid Rubber

• Metal - Coated or Galvanized Steel Weathered Aluminum
• Weathered Copper
EPDM Rubber membrane
• Concrete (except foot traffic surfaces)
• Urethane Foam
• Primed Wood
• Fiberglass EPDM lined fish ponds
• PVC Sheet and Pipe
• Acrylic Sheet
• Sponge Rubber insulation
• EPDM Rubber Membrane on flat or sloped Roofs
• Weathered Steel Siding
• Weathered Fiberglass
• Weathered standing seam and corrugated metal roofs
• Weathered Vinyl, PVC and Polycarbonate plastic
• Foam insulation for pipe
• Cast Concrete foundations


Application of Liquid Rubber